Safety, documentedWork Health, Safety and Environment

FSB operates a documented Work Health, Safety and Environment Management System. Safety documentation can be supplied with quotations and before work starts on site.

SystemWHS and environment

SWMSTask-specific

PermitsHot work, confined space

Pre-startsRecorded daily

Management system

How safety is managed

Our management system sets out how work is planned, checked and recorded, in the workshop and on site. It is built around a safety manual and policies, an induction handbook for new workers, and a set of registers.

  • Safety manual and policies
  • Induction handbook
  • Training and skills register
  • Plant maintenance register
  • Hazard register
  • Safety data sheets register
Fabricator in a hard hat and safety glasses grinding a large steel pipe section in a workshop

On every job

Planned, permitted and checked

The documents and checks that sit behind work in the workshop and on site.

Safe Work Method Statements
Task-specific SWMS for high-risk work, including welding, hot works, confined spaces and working at heights.
Hot work permits
A permit system for hot work such as welding, cutting and grinding.
Confined space entry permits
A permit system for entry into confined spaces.
JSEA
Job safety and environmental analysis to identify hazards and controls for a task.
Take 5
A short hazard check by the worker before each task starts.
Daily pre-starts
Recorded pre-start checks on welders, vehicles and forklifts.

For principal contractors

Documents for your project

Ask for the documents you need for prequalification or site entry, and we will supply them with the quotation or before work starts.

When you request a quote, tell us

  • Which documents your site needs before work starts
  • Your induction requirements
  • Any permits your site issues itself
  • Site rules that affect hot work, access or working hours

Questions

Safety questions

Can you provide SWMS with a quotation?

Yes. SWMS for the scope can be supplied with the quotation or before work starts.

Do you use hot work and confined space permits?

Yes. FSB's system includes hot work and confined space entry permits. If your site has its own permit system, tell us when you request a quote.

How is equipment checked?

Welders, vehicles and forklifts get a recorded pre-start check each day.

How are new workers inducted?

Through FSB's documented induction process and induction handbook, before they start work in the workshop or on site.

Have a project coming up?

Send your drawings for a quote, or call to discuss your project.